Live tracker

Is NSW on track for 2030?

A live check on whether NSW is building enough wind, solar and storage to replace its coal power stations.

Key terms in plain English
NEM
The National Electricity Market, the shared grid and market for Queensland, NSW, the ACT, Victoria, South Australia and Tasmania. Western Australia and the Northern Territory run their own.
MW and GW
Power, how much can be produced at one moment. A gigawatt (GW) is 1,000 megawatts (MW). One unit of a large coal power station is about 0.5 to 0.7 GW.
MWh, GWh and TWh
Energy, power kept up over time. 1 GW running for one hour makes 1 GWh, and 1,000 GWh is 1 TWh. A battery's GW says how fast it can charge or discharge, and its GWh how much it can hold.
Operating, committed, anticipated, proposed
How far along a project is. Operating projects are running. Committed ones have their finance and approvals and are being built. Anticipated ones are well advanced but not yet committed. Proposed ones have only been announced, and many will never be built.
Long duration storage
Batteries and pumped hydro that can keep supplying power for 8 hours or more, long enough to cover a whole evening and night.
…days until the 2030 targets
…days until Eraring is due to close
…days until the 2035 emissions target

Wind and solar built

0%of the 12 GW minimum

    Time used

    0%of the time to 2030

      Long duration storage built

      0%of the 2 GW minimum

        New wind and solar

        The Net Zero Commission put the gap to 12 GW at 7.9 GW in December 2025, counting projects the official way.

        New long duration storage

        Power, against the 2030 goal

        Energy, against the 2034 goal

        What has been switched on each year

        Hover over a bar to see the projects.

        How the picture has changed

        New wind and solar in each AEMO release since 2021, against the 12 GW minimum. The dashed lines run to 2030 at the pace needed and at the pace of the last two years.

        Coal still to close

        Coal produced 97% of NSW electricity sector emissions in 2022–23. Each bar runs from today to the closure year reported to AEMO. Hover over or tap a station for details.

        Looking to 2035

        70%

        cut in NSW emissions on 2005 levels by 2035, set in law. By 2022–23 the cut was 25%.

        42 GWh

        of long duration storage targeted by 2034, raised in 2025 from the legal minimum of 28 GWh.

        …

        of coal capacity is due to close by 2035.

        Every NSW project

        All new wind, solar, battery and pumped hydro projects in AEMO's latest release, grouped by site.

        How the figures are worked out

        • New means a wind, solar, battery or pumped hydro unit that was not operating in AEMO's January 2021 release, the first after the Roadmap became law. Operating includes units being commissioned.
        • Committed projects have finance and approvals. Anticipated ones are well advanced. Proposed ones are announced only, and many will not be built.
        • Targets. The Electricity Infrastructure Investment Act sets minimums of 12 GW of new renewable generation and 2 GW of long duration storage by 2030, and 28 GWh of long duration storage by 2034. In its 2025 Infrastructure Investment Objectives Report, the NSW Consumer Trustee (ASL, formerly AEMO Services) raised the targets to 16 GW and 42 GWh, warning that the minimums alone would push prices up as coal closes.
        • Long duration storage is storage that can run at full power for at least 8 hours. The page works out each unit's hours from the capacity and energy AEMO reports. Snowy 2.0 is shown separately because it was already committed when the Roadmap began.
        • The official objectives count generation by annual output, so this page measures capacity as a guide.
        • The Year column shows when an operating project first appeared as operating in an AEMO release. For other projects it shows the full commercial use year the developer reported, in italics. Many proposed projects have not reported one.
        • AEMO's NSW region includes the ACT, so ACT projects such as the Capital Battery are counted here.
        • The page checks AEMO every week and rebuilds itself when a new release appears.
        • Sources AEMO Generation Information, NSW Net Zero Commission 2026 Annual Progress Report, NSW Electricity Infrastructure Roadmap and ASL's 2025 Infrastructure Investment Objectives Report.